Preliminary Storm Water Plan

The Woodbine walking path has been underwater the majority of this spring and summer due to heavy rains and increased runoff from upstream subdivisions. Woodbine is working with the Town of Blacksburg to improve conditions and better handle storm water in our neighborhood. Below are the documents put together by Town Engineer Lee Hixon, presented at the June 30 meeting between the town and Woodbine homeowners.

Woodbine Meeting Summary: summary of the June 30 meeting.

Woodbine Presentation: Town Engineer Lee Hixon’s preliminary storm water plan. (Large download–powerpoint presentation.)

Proposed changes along the trail system:
Woodbine Preliminary Plan (Large download – image file.)

Comments are closed.